Creating a Dynamic Progress Indicator Using the Definition Bind Type
Create a dynamic navigation definition using navigation groups and action buttons to determine which buttons should appear in the progress indicator.
Implementation:
- Open the Properties tab for a dynamic Progress Indicator and click Configure.
- Tick the Enable Dynamic Progress Indicator checkbox.
- Use the Bind Type drop-down menu to select Definition.
- Select one of the radio buttons in the Definition tab to determine which navigation group will be visible.
- Bind to Your Navigation Group Using Model Form (Question Group) Keywords - This links navigations groups to specific question groups. Using this option will ensure that buttons in a navigation group will always appear when the linked question group is viewed.
- Bind to Your Navigation Groups Using the Result of an Action - This links navigation groups to the result of an action.
- (Action-bind only) Use the Expression Action drop-down menu to select the action that will run when the model is loaded. The result of this action must be a valid keyword of a navigation group.
- Switch to the Action Buttons panel.
- Create the navigation definition buttons to be assigned to the navigation groups.
- Switch to the Navigation Groups panel.
- Create the navigation groups you want to include in the progress indicator and add the related buttons to each.
- Click Save to create the progress indicator.